Weston Milling, located in Brisbane South, required an overhaul of all their electrical equipment and enclosures after damage occurred during the January 2011 floods.
Following the floods, Weston Milling were forced to replace all electrical enclosures and components at their Moorooka location. This project had a critical timeframe that would enable the customer to return to operation as quickly as possible.
B&R Enclosures supplied a fully populated TBKS (sloping roof) enclosure including terminations, pushbuttons and wiring that were capable of meeting the specific requirements of the project.
By working in conjunction with Stowe Australia, B&R Enclosures were able to satisfy the specific needs of Weston Milling. The solution has significantly improved the reliability of the systems and provided a secure enclosure.